← 313.pdf_v_d04082021.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 693 (66th St) Safety Enhancements from 30th Ave N to 58th Ave N 437643-1-52-01
| Project Details | |
| Work Type | Safety Enhancements |
|---|---|
| Phase | Completed |
| Limits | From 30th Ave NE to 58th Ave. N |
| Project Start | November 2020 |
| City | St. Petersburg |
| County | Pinellas |
| Road | 66th Street SR 693 |
| Construction Cost | $2,094,474.66 |
| Estimated Completion | Summer 2021 |
| Contractor | Preferred Materials Inc. |
About
FINAL ACCEPTED ON APRIL 6, 2021
This project will provide safety enhancements on SR 693 (66th St) between 30th Ave. N and 58th Ave N. in St. Petersburg by lengthening turn lanes and modifying medians.
Construction has begun and is expected to finish in the summer of 2021.
Contact Information
Project Information
David Olund 727-575-8300
Davidm.Olund@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us