← 1229.pdf_v_d09292026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Air Cargo Road and Tampa Bay Boulevard Operational and Safety Improvements 458147-1-52-01

Project Details
Work TypeOperational and Safety Improvements
PhaseDesign
LimitsAir Cargo Road from Tampa Bay Boulevard to south of Orient Street; Tampa Bay Boulevard from Lois Avenue to North Dale Mabry Highway
Length0.75 miles
CityTampa
CountyHillsborough

About

This project includes milling, resurfacing, and widening to provide two lanes in each direction along these sections of Air Cargo Road and Tampa Bay Boulevard. Other improvements include adding continuous sidewalks.

Construction activities are expected to begin 2027.

Contact Information

Design Manager Eyra Cash 813-975-6164 Eyra.Cash@dot.state.fl.us

Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us