← 877.pdf_v_d08142026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 54 Pedestrian Overpass for the Suncoast Trail 449315-1-52-01
| Project Details | |
| Work Type | Pedestrian overpass |
|---|---|
| Phase | Construction |
| Limits | Over SR 54 along the Suncoast Trail |
| Project Start | June 22, 2026 |
| Length | .6 miles |
| City | Odessa |
| County | Pasco |
| Road | SR 54SR 589Suncoast Parkway |
| Construction Cost | $9 million |
| Estimated Completion | Summer 2027 |
| Contractor | Cone & Graham, Inc. |
About
This project is building a pedestrian overpass over SR 54 as part of the Suncoast Trail.
The existing Suncoast Trail will be reconstructed to accommodate the overpass and will also maintain a street-level crossing for pedestrians and bicyclists to cross SR 54. Short-duration pedestrian detours are planned when work overhead is in progress. The trail is expected to remain open to users throughout construction.
Construction is underway as of June 22, 2026.
Contact Information
Project Information
John McShaffrey 813-975-6930 john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 449315-1-52-01)
Last Updated: 08/14/2026