← 1046.pdf_v_d09282026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 586 (Curlew Road) Repaving from Bogie Lane to Fisher Road 448041-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Design |
| Limits | from Bogie Lane to Fisher Road |
| Length | 2.01 Miles |
| City | Dunedin |
| County | Pinellas |
| Road | Curlew Road SR 586 |
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will repave SR 586 (Curlew Road) from Bogie Lane to Fisher Road in Pinellas County. This project also includes safety improvements including new pedestrian signals, lighting, and crosswalks at Pinellas CR 1 and Belcher Road, and new sidewalks on the southside of Curlew Road from Birdie Lane to Cardinal Road.
The existing storm sewer pipe within the project limits will also be replaced.
This project is currently in the design phase. Construction is anticipated to begin in 2026.