← 1127.pdf_v_d09282026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
US 301 Repaving from SR 574 (Dr Martin Luther King Jr Blvd) to Hampton Oaks Pkwy 425501-1-52-01
Project Details
Work TypeResurfacing
PhaseConstruction
Limitsfrom SR 574 (Dr Martin Luther King Jr Blvd) to north of Hampton Oaks Pkwy
Project StartSeptember 9, 2026
Length1.8 miles
CityTampa
CountyHillsborough
RoadUS 301
Construction Cost$5.5 million
Estimated CompletionSummer 2027
ContractorPreferred Materials, Inc.
This project is to preserve and extend the life of the existing pavement by repaving section of US 301 from SR 574 (Dr Martin Luther King Jr Boulevard) to Hampton Oaks Parkway in Hillsborough County.
In addition to resurfacing, improvements include:
About
adding signing and pavement markings
performing minor drainage work
repairing sections of sidewalk
constructing an inside shoulder
Construction activities are expected to finish summer of 2027.
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 425501-1-52-01) Last Updated: 09/28/2026