← 1213.pdf_v_d05132026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 200 Bridge Replacement from E Spruce Drive to south of SW 137th Court 454454-1-52-01
Project Details
Work TypeBridge Replacement and Add Lanes
PhaseDesign
LimitsSR 200 from E Spruce Drive to south of SW 137th Court
Length1.09 miles
CityDunnellon
CountyCitrus Marion
RoadSR 200
Contact Information
Design Manager
Art Mariano
813-975-6249
Art.Mariano@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia @dot.state.fl.us
About
This project will replace the existing SR 200 bridge over the Withlacoochee River between Citrus and Marion counties.
The project includes constructing two new, three-lane bridges in each direction of travel, removal of the existing bridge, as well as widening the existing roadway, to connect to the new bridges.