← 398.pdf_v_d06102020.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 60 Highway Lighting and ITS Upgrades from McMullen Booth Road to Rocky Point Drive
424507-3-52-01
| Project Details | |
| Work Type | Highway Lighting and ITS |
|---|---|
| Phase | Completed |
| Limits | from McMullen Booth Rd to east or Rocky Point Drive |
| Project Start | August 2017 |
| City | Clearwater Safety Harbor Tampa |
| County | Hillsborough Pinellas |
| Road | Courtney Campbell Causeway SR 60 |
| Construction Cost | $8.3 million |
| Estimated Completion | Summer 2020 |
| Contractor | Highway Safety Devices, Inc |
About
This project was completed and final accepted on June 9, 2020.
This Design-Build project is replacing the existing highway lighting and installing six new traffic monitoring cameras and twelve vehicle detection devices along the corridor in Pinellas and Hillsborough counties.
The cameras and vehicle detection devices will help traffic engineers manage traffic flow along the SR 60 (Courtney Campbell Causeway) from McMullen Booth Road to Rocky Point Drive.
This $8.3 project is expected to finish in the summer of 2020.
Contact Information
Project Information
Dan Haberle 727-575-8300
Daniel.Haberle@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us