← 1152.pdf_v_d08062026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 92 (Dale Mabry Highway) Pavement Rehabilitation from north of Kennedy Boulevard to north of West South Avenue 451989-1-52-01
| Project Details | |
| Work Type | Pavement Rehabilitation |
|---|---|
| Phase | Design |
| Limits | US 92/SR 600/Dale Mabry Hwy from north of Kennedy Boulevard to north of West South Avenue |
| Length | 3.3 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Dale Mabry Highway SR 600 US 92 |
About
The purpose of this project is to provide concrete rehabilitation along with milling and resurfacing to extend the service life along this section of US 92 in Hillsborough County. Other improvements include sidewalk repair/replacement, signing and pavement markings, signalization, lighting, ITS, ADA safety enhancements and access changes.
Construction is anticipated to begin late 2027.
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us