← 979.pdf_v_d07312024.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 19 Pedestrian Mid-Block Crosswalk at Buena Vista Ln/Bartelt Rd in Pasco County
254677-5-43
| Project Details | |
| Work Type | Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | at Buena Vista Lane/Bartelt Road |
| Project Start | December 8, 2023 |
| City | Holiday |
| County | Pasco |
| Road | US 19 |
| Construction Cost | $600,000 |
| Estimated Completion | Summer 2024 |
| Contractor | Cone & Graham, Inc. |
Contact Information
Project Information
Maddie Pfingsten
727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of June 13, 2024, all construction activities associated with this project have been completed.
The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is installing a new pedestrian mid-block crosswalk at US 19 and Buena Vista Lane/Bartelt Road in Pasco County.
Other safety and operational improvements include roadway resurfacing, highway lighting, and median and sidewalk modifications.
Construction is underway and expected to be complete in summer 2024.