← 1086.pdf_v_d01292026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Pasco County Sidewalk Gaps - Various Locations 450970-1-52-01

Project Details

Project Details
Work TypeSidewalk
PhaseCompleted
Limits1) Land O' Lakes Blvd from north of Gator Lane to north of Causeway Blvd. and 2) SR 54 from east of Northpointe Pkwy to east of Hackberry Sq
Project StartSeptember 11, 2025
Length0.846 miles
CityLand O' Lakes Lutz
CountyPasco
RoadLand O' Lakes Boulevard SR 54 US 41
Construction Cost$644,000
Estimated Completionearly 2026
ContractorAlexander Design + Build, LLC

About

As of January 25, 2026, all construction activities associated with this project have been completed.

This project built concrete sidewalks at two locations:

  1. A 6-foot-wide sidewalk on the west side of US 41 (Land O'Lakes Boulevard) from north of Gator Lane to Sabal Palm Court.
  2. A 5-foot-wide sidewalk on the north side of SR 54 from east of Bexley Village Drive to west of Crestbend Boulevard.

The project also included new concrete driveways, drainage improvements, pavement markings, and new signs.

Contact Information

Project Information

John McShaffrey 813-975-6930 john.mcshaffrey@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us