← 103_v_07202023.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
Southwest Florida Florida Department of Transportation
US 98 (SR 35) from West Daughtery Road to North of West Socrum Loop Road 436672-1
| Project Details | |
| Work Type | Widening |
|---|---|
| Phase | PD&E |
| Limits | from West Daughtery Road to North of West Socrum Loop Road |
| Length | 3.4 miles |
| City | Lakeland |
| County | Polk |
| Road | SR 35 US 98 |
Contact Information
PD&E Project Manager David C. Turley, P.E. 863-519-2255
About
The Florida Department of Transportation (FDOT), District One, began a Project Development and Environment (PD&E) study in March 2020 to identify and evaluate the possibility of operational and safety improvements to US 98 (State Road (SR) 35). The project begins at West Daughtery Road and ends just north of West Socrum Loop Road.