← 1235.pdf_v_d07212026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 60 (Brandon Boulevard) Resurfacing from east of Grand Regency Boulevard to east of Buckingham Place 451454-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 60 (Brandon Boulevard) from east of Grand Regency Boulevard to east of Buckingham Place |
| Length | 1.75 miles |
| City | Brandon |
| County | Hillsborough |
| Road | Brandon Boulevard SR 60 |
About
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of SR 60 (Brandon Boulevard) in Hillsborough County.
Other improvements include ADA upgrades, sidewalk repair, and safety improvements.
Construction is currently anticipated to begin Spring 2029.
Contact Information
Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us