← 1121.pdf_v_d04282025.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SR 60 Corridor Study from Shore Drive to Rocky Point Drive 454711-1

Project Details

Work TypeCorridor Study
PhaseStudy
LimitsSR 60 from Shore Drive to Rocky Point Drive
Length7.8 miles
CityClearwater
CountyPinellas
RoadSR 60

Contact Information

Study Manager

Eyra Cash 813-975-6164

Eyra.Cash@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The Florida Department of Transportation (FDOT) District Seven is conducting the State Road 60 Corridor Study to evaluate travel time reliability for vehicular travel, enhance multimodal access and connectivity, and safety improvements in Pinellas County, Florida.

The Study will also analyze options to improve the SR 60 at Belcher Road intersection.