← 1112.pdf_v_d04212026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
I-75 Resurfacing from south of Fowler Avenue to Pasco County Line 449156-1-52-01 & 449156-1-52-02
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | from south of Fowler Avenue to Pasco County Line |
| Length | 19 miles |
| City | Temple Terrace |
| County | Hillsborough |
| Road | I-75 |
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla Mejia@dot state fl us
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Interstate 75 in Hillsborough County.
Construction is currently anticipated to begin in Winter 2027.