← 1165.pdf_v_d10282025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
I-275 Resurfacing from south of Nebraska Avenue to Pasco County Line 449155-1-32-01
Project Details
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | I-275 from south of Nebraska Avenue to Pasco County Line |
| Length | 7.1 miles |
| City | Lutz |
| County | Hillsborough |
| Road | I-275 |
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of Interstate 275 (I-275) in Hillsborough County.
Contact Information
Design Manager
Dinyar Sharifabad
975-6172
Dinyar.Sharifabad@dot.state.fl.us
In addition to resurfacing, the project also includes restriping of bridges, guardrail/bridge end treatment upgrades, and replacement of fence along right of way as needed.
Construction is currently anticipated to begin in Spring 2028.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us