← 475.pdf_v_d11172020.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
I-275 Operational Improvements (Westshore area) 441111-1-52-01
Project Details
PhaseCompleted
LimitsI-275 from east of the Howard Frankland Bridge to east of Lois Avenue
Project StartMarch 2019
Length2.4 miles
CityTampa
CountyHillsborough
RoadI-275SR 60
Construction Cost$31 Million
Estimated CompletionFall 2020
ContractorThe Middlesex Corporation
About
This project is complete and final accepted by FDOT as of November 9, 2020.
Construction is complete on the I-275 corridor to improve operations of the I-275 / SR 60 interchange and I-275 from east of the Howard Frankland Bridge to Lois Avenue. These improvements are designed to provide congestion relief by adding lanes to I-275.
Here are the major improvements:
Contact Information
Project Information
Tom Lay 813-975-3554
tom.lay@dot.state.fl.us
Media Contact
John McShaffrey, APR 813-975-6930
lohn.McShaffrey@dot.state.fl.us
Add a lane in both directions of I-275 between the exit ramps to SR 60 and the entrance ramps from SR 60. COMPLETED
Convert a merge-lane to a through-lane on northbound I-275 from the SR 60 entrance ramp. COMPLETED
Add an auxiliary lane on northbound I-275 from the SR 60 entrance ramp to Dale Mabry Highway exit ramp.
COMPLETED
Add an auxiliary lane on northbound I-275 between West Shore Boulevard and Lois Avenue with a noise barrier. COMPLETED
Lengthen the entrance ramp from SR 60 onto southbound I-275. COMPLETED
Add a lane to the northbound I-275 exit ramp to SR 60. COMPLETED 9/26/2020
Latest progress! A new lane opened on northbound I-275 the morning of September 26, 2020, adding a lane to northbound I-275 Exit 39 to SR 60 / Kennedy Boulevard and lengthening the merge area on the approach to the flyover bridge onto westbound SR 60.