← 1132.pdf_v_d09282026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 301 Reconstruction from Hillsborough/Pasco County Line to south of SR 56 255796-3-52-01
| Project Details | |
| Work Type | Add Lanes and Reconstruct |
|---|---|
| Phase | Design |
| Limits | US 301 from Hillsborough/Pasco County Line to South of SR 56 |
| Length | 1.4 miles |
| City | Zephyrhills |
| County | Pasco |
| Road | US 301 |
Contact Information
Design Manager
Amanda Dicks
813-975-3562
Amanda.Dicks@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to reconstruct and widen the existing two-lane roadway to four-lane roadway of US 301.
In addition to reconstructing and widening, this project also includes signing and pavement markings and minor drainage improvements.
Other improvements include adding sidewalk and shared use path along US 301.