← 473.pdf_v_d10082026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

US 41 Widening From S of Withlacoochee Trail Bridge to N of Sportsman Point 257165-4-52-01

Project Details
Work TypeWidening
PhaseDesign
LimitsFrom S of Withlacoochee Trail Bridge to N of Sportsman Point
Length1.2 miles
CityInverness
CountyCitrus
RoadFlorida Avenue (Citrus) US 41

Contact Information

Design Manager

Eyra Cash 813-975-6164

Eyra.Cash@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to reconstruct and widen US 41 from the existing 2 lanes to a 4-lane road with median separation. The project also includes bike lanes, sidewalks, new bridges over the Withlacoochee Trail, a mid-block pedestrian crossing, and new pond sites.

The project is currently in the design phase. Construction activities are anticipated to begin late 2028.