← 1126.pdf_v_d08122026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
Highland Avenue Corridor Improvements from Violet Street to US 92 (Hillsborough Avenue) 440511-4-52-01
| Project Details | |
| Work Type | Urban Corridor Improvements |
|---|---|
| Phase | Design |
| Limits | Highland Avenue from Violet Street to US 92 (Hillsborough Avenue) |
| Length | 0.3 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Highland Avenue |
About
This project will improve the urban corridor on Highland Avenue from Violet Street to US 92 (Hillsborough Avenue) in Tampa.
Contact Information
Design Manager
Carlos Perez
813-975-6929
CarlosH.Perez@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Key improvements within the project limits include:
Add 8 foot sidewalk along the western side of Highland Avenue
Adding a crosswalk at Wilder Avenue
Adding a crosswalk at Giddens Avenue
Restore roadway pavement
Upgrading the corridor lighting, ADA, pavement markings, and signage
Construction is currently anticipated to begin in late 2027.