← 459.pdf_v_d11142023.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 39 Repaving from Knights Griffin Road to the Pasco County Line Road 439831-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Knights Griffin Road to the Pasco County Line Road
Project StartNovember 6, 2022
Length6.3 miles
CityPlant City
CountyHillsborough
RoadPaul Buchman Highway SR 39
Construction Cost$11.3 million
Estimated CompletionNovember 6, 2023
ContractorC.W. Roberts Contracting, Inc.
Contact Information
Project Information
Maricelle Venegas 813-975-6204
RoadWork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
All construction activities associated with this project were completed on Monday, November 6, 2023.
The Florida Department of Transportation's contractor, C.W. Roberts Contracting, Inc., made improvements to SR 39 (Paul Buchman Highway) from north of Knights Griffin Road to the south of Pasco County Line Road in Hillsborough County.
Construction activities along this six-mile stretch of roadway included the removal the old asphalt pavement, resurfacing, and restriping both travel lanes and shoulders, and installing drainage pipes. In addition, left-turn lanes were added to SR 39 at Hunter Road along with extending the northbound left-turn lane from SR 39 onto westbound Bruton Road.
The $11.3 million project finished on November 6, 2023.