FLORIDA DEPARTMENT OF TRANSPORTATION
US 27 FROM CLOVERLEAF ROAD TO SR 66
HIGHLANDS COUNTY
CONSTRUCTION BEGINS MARCH 9, 2021
Financial Project ID: 439434-1-52-01 & 439434-1-52-02
March 2021
CONSTRUCTION PROJECT
The Florida Department of Transportation will begin work on March 9, 2021 to make improvements to US 27 from Cloverleaf Road to SR 66 in Highlands County. The project length is approximately six miles. The project limits are identified below on the project location map.
PROJECT IMPROVEMENTS
Resurface US 27 from Cloverleaf Road to SR 66
Modify median openings
Project Location Map
Enlarged map on back page
Add left turn lanes at Lake Josephine RV
Resort and Heartland Animal Hospital
Install curb and gutter, signage and pavement markers
Replace guardrail
Improve drainage
Install new traffic signals at Twitty Road and Lake Josephine Drive
Estimated construction cost is $10 million
PROJECT SCHEDULE
Construction begins March 9 2021; estimated completion is spring 2022
Daytime and nighttime lane closures may occur during construction on US 27 from Cloverleaf Road to SR 66, as needed, weather permitting
PROJECT CONTRACTOR
C.W. Roberts Contracting, Inc.
STAY INFORMED
by visiting
www.swflroads.com/current projects
CONTACT US
For more information about the improvements, contact:
Corine Burgess, Community Outreach Manager
(863) 225-0422
corine.burgess@dot.state.fl.us
Brian R. Rick, Public Information Specialist (863) 519-2828
brian.rick@dot.state.fl.us