US 41B (S 20th Street) High Friction Surface Treatment from south of Maritime Boulevard to north of Oceanview Place 254677-6-03

Project Details
Work TypeSafety Improvements
PhaseCompleted
Limitsfrom south of Maritime Boulevard to north of Oceanview Place
Project StartJanuary 5, 2025
Length0.4 mile
CityTampa
CountyHillsborough
RoadUS 41 Business
Construction Cost$1.1 million
Estimated CompletionSpring 2025
ContractorCone & Graham, Inc.

Contact Information

Project Information

Bryce Johns 727-575-8334 Bryce.Johns@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

As of March 11, 2025, all construction activities associated with this project have been completed.

The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., is making roadway improvements on US 41B (S 20th Street) from south of Maritime Boulevard to north of Oceanview Place in Hillsborough County.

Elements of work shall include but are not limited to roadway milling and resurfacing with a high surface friction treatment. These improvements will protect against skidding and provide a safe travel path for vehicles.

Construction activities are expected to be complete in spring 2025.

***** *****

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.