← 993.pdf_v_d08112026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
ALT US 19 (N Missouri Avenue) Intersection Improvements at Rosery Road 451097-1-52-01
| Project Details | |
| Work Type | IntersectionImprovements |
|---|---|
| Phase | Construction |
| Limits | Alt US 19 atRosery Road |
| Project Start | Late 2026 |
| Length | .640 Miles |
| City | Largo |
| County | Pinellas |
| Road | Alt US 19 |
| ConstructionCost | $925,000 |
Contact Information
About
This project will improve this intersection with repaving, curb ramp realignment, crosswalks and other pedestrian safety intersection improvements on Alt US 19 (N Missouri Avenue) at Rosery Road in Pinellas County.
Construction is anticipated to begin late 2026.
Project Information
Maddie Griffin 727-575-8334
maddie.griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us