← 470.pdf_v_d03182021.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
I-275 and Alt. US 19 Bridge Maintenance- multiple locations in Pinellas County 441468-1-52-01
| Project Details | |
| Work Type | Bridge Maintenance |
|---|---|
| Phase | Completed |
| Limits | I-275 at SR 682 and Alt. US 19 over Long Bayou and over the Pinellas Trail |
| Project Start | October 2020 |
| City | Seminole |
| County | Pinellas |
| Road | Alt US 19 |
| Construction Cost | $657,608.32 |
| Estimated Completion | Spring 2021 |
| Contractor | M&J Construction Company of Pinellas County, Inc. |
About
FINAL ACCEPTED ON MARCH 15, 2021
This project will repair the bridge decks on I-275 and Alt. US 19 at the following locations in Pinellas County:
- I-275 northbound ramp bridge from SR 682/Bayway
- Alt. US 19 over Long Bayou in both the northbound and southbound directions
- Alt. US 19 over the Pinellas Trail
Construction is expected to finish in the spring of 2021.
Contact Information
Project Information
Dan White 727-575-8300
Daniel.White@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us