← 387.pdf_v_d03242026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
US 19 New Interchanges between Timberlane Road and Lake Street 433796-1-52-01
Project Details
Work TypeNew Interchanges
PhaseDesign
LimitsFrom south of Timberlane Road to south of Lake Street
CityPalm Harbor Tarpon Springs
CountyPinellas
RoadUS 19
Contact Information
Design Manager
Omar Chehab, P.E.
813-975-6468
Omar.Chehab@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The interchange and roadway improvement project is modifying the existing six-lane divided highway to a six-lane controlled access roadway with one-way frontage roads in both directions parallel to US 19. New interchanges will be built at Klosterman Road and Mango Street.
*Design is currently on hold. Construction is not currently funded.