← 1251.pdf_v_d09302026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
SR 699 (Gulf Boulevard) Resurfacing from 150th Avenue to 183rd Terrace 452002-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 699 (Gulf Boulevard) from 150th Avenue to 183rd Terrace W |
| Length | 3.4 miles |
| City | North Redington Beach |
| County | Pinellas |
| Road | Gulf Boulevard SR 699 |
Contact Information
Design Manager Indike Ratnayake 813-975-3678 Liyanage.Ratnayake@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 699 (Gulf Boulevard) in Pinellas County.
In addition to resurfacing, this project also includes installing a midblock crossing between Coral Avenue and Beach Avenue.
Construction is currently anticipated to begin in spring of 2029.