← 1190.pdf_v_d03232026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
SR 699 (Gulf Boulevard) Repairs from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road) 456312-2-52-01
| Project Details | |
| Work Type | Repairs |
|---|---|
| Phase | Design |
| Limits | SR 699 (Gulf Boulevard) from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road) |
| Length | 9.35 miles |
| City | Madeira Beach St. Petersburg |
| County | Pinellas |
| Road | Gulf Boulevard SR 699 |
About
This project will repair damage along SR 699 (Gulf Boulevard) from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road).
Contact Information
Design Manager
Helena Ly
813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
Repairs include:
- Drainage inlet top repairs
- Drainage inlet top replacements
- Sidewalk repairs
- Pavement repairs
- Driveway repairs
- Pavement marking restoration
- Sign repairs
- Sign replacement
Construction is anticipated to begin Fall 2026.