← 55.pdf_v_d08182020.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 56 New Roadway Extension from Meadow Pointe Blvd to US 301 434765-1-52-01
Project Details
Work TypeNew Roadway Project
PhaseCompleted
LimitsMeadow Pointe Boulevard to US 301
Project StartFebruary 2017
Length6 miles
CityWesley Chapel Zephyrhills
CountyPasco
RoadSR 56
Construction Cost$60 million
Estimated CompletionLate 2019
ContractorCone & Graham, Inc.
Contact Information
Project Information Greg Deese, P.E. 813-975-3563 gregory.deese@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
THIS PROJECT WAS ACCEPTED ON NOVEMBER 25, 2019.
Cone and Graham, Inc., on behalf of the Florida Department of Transportation, began construction on the $60 million extension of SR 56 between Meadow Pointe Blvd and US 301 in southeastern Pasco County in February 2017.
The new six-mile long, four-lane divided roadway includes a ten-foot wide multi-use trail on the south side of the road, a five-foot wide sidewalk on the north side of the road and seven-foot wide bicycle lanes on the shoulders in each direction.
There are new signalized intersections on Morris Bridge Road where the new SR 56 crosses it and on US 301 where the new SR 56 ties into it.