← 564.pdf_v_d01052021.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
Bridge Maintenance Pinellas County Multiple locations 443833-1-52-01
| Project Details | |
| Work Type | Bridge Maintenance |
|---|---|
| Phase | Completed |
| Limits | SR 580, US 19, SR 580, SR 688, SR 679 |
| Project Start | Fall 2020 |
| City | Clearwater Safety Harbor St. Petersburg |
| County | Pinellas |
| Road | SR 580, SR 60, SR 679, SR 688, SR 688, SR 19 |
| Estimated Completion | Spring 2021 |
| Contractor | Orlando R&B, LLC |
Contact Information
Project Information
David Gillett, PE 727-575-8300
David.Gillett@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
Google
About
FINAL ACCEPTED ON JANUARY 5, 2021
This project will replace or repair the bearing pads and plates on bridges in Pinellas County at the following locations;
SR 60 at the Clearwater Harbor
US 19 over 49th St.
US 19 Over Drew St.
US 19 over SR 688 (Ulmerton Road)
SR 580 over Safety Harbor Bay
SR 679 at Bunces Pass
The project is anticipated to begin during the fall of 2020 and finish in the spring of 2021.