← 760.pdf_v_d10282024.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 44 (Gulf to Lake Hwy) Repaving from Norvell Bryant Hwy to west of N Lopp Point 432582-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Norvell Bryant Hwy to west of N. Lopp Point
Project StartOctober 14, 2023
Length2.4 miles
CityCrystal River Lecanto
CountyCitrus
RoadGulf To Lake Highway (Citrus) SR 44
Construction Cost$5.9 million
Estimated CompletionSeptember 16, 2024
ContractorSuperior Asphalt, Inc.
Contact Information
Project Information
John McShaffrey 813-975-6930 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
This project was accepted from the contractor as completed on October 17, 2024.
This project milled and resurfaced SR 44 (Gulf to Lake Highway) between Norvell Bryant Highway and North Lopp Point.
Other work included safety improvements such as sidewalk connectivity, sidewalk repairs, curb ramp reconstruction, and pedestrian lighting installed at signalized intersections. Signing, pavement markings, and minor drainage improvements were also done throughout the project area and signalization upgrades were made at N Rock Crusher Road.