← 1247.pdf_v_d09092026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 688 Bridge Repair at Various Locations 445834-1-52-01
| Project Details | |
| Work Type | Bridge Repair |
|---|---|
| Phase | Construction |
| Project Start | Fall 2026 |
| County | Pinellas |
| Road | SR 688 |
| Construction Cost | $6.4 million |
| Contractor | Seacoast, Inc. |
Contact Information
Project Information
Maddie Griffin
727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will make repairs to structural, mechanical and electrical components on the SR 688 Bridge at the Intercoastal Waterway in Pinellas County.
Construction is expected to begin in the fall of 2026.
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 445834-1-52-01)
Last Updated: 09/09/2026