Tampa Bay
Florida Department of Transportation
SR 679 (Bayway Bridge-Structure E) Replacement and Repaving from north of Yacht Club Lane to SR 682 410755-2-52-01
Project Details
| Project Details | |
| Work Type | Bridge Replacement and Repaving |
|---|---|
| Phase | Completed |
| Limits | From north of Yacht Club Lane to SR 682 |
| Project Start | December 2018 |
| Length | 2 miles |
| City | St. Pete Beach St. Petersburg |
| County | Pinellas |
| Road | Pinellas Bayway SR 679 |
| Construction Cost | $56 million |
| Estimated Completion | Early 2023 |
| Contractor | American Bridge Company |
About
As of January 30, 2023, all construction activities associated with this project have been completed.
The design-build project includes replacing the existing two-lane bascule bridge with a two-lane, high-level, fixed bridge (Bayway Structure "E," which is the bridge between Isla Del Sol and Tierra Verde islands), repaving the existing SR 679 roadway between SR 682 and the new bridge, and replacing a seawall south of the bridge along SR 679 in Pinellas County.
The project will also include the construction of a 12-foot-wide shared-use path on the east side and a 5-foot-wide concrete sidewalk on the west side of SR 679. Other improvements include the addition of a round-about at Madonna Boulevard / 1st Street.
Contact Information
Project Information
Maddie Pfingsten
727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
โข Three projects; 410755-2, 427143-2, 432587-1 have been combined into a single design-build project. This page will serve as the source of information for the entire design-build effort.
The $56.8 million design-build project is expected to finish early 2023.