← 1249.pdf_v_d09242026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 693 (66th Street North) Resurfacing from Park Boulevard to Bryan Dairy Road
449210-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 693 (66th Street North) from Park Boulevard to north of Bryan Dairy Road |
| Length | 2.5 miles |
| City | Pinellas Park |
| County | Pinellas |
| Road | 66th Street SR 693 |
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 693 (66th Street North) in Pinellas County.
Construction is currently anticipated to begin in spring of 2029.
Contact Information
Design Manager
Indike Ratnayake 813-975-3678
Liyanage.Ratnayake@dot.state.fl.
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us