Tampa Bay Florida Department of Transportation
Alt US 19 Repaving from Tampa Road to Meres Boulevard 448042-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Tampa Road to Meres Boulevard
Project StartJanuary 7, 2025
Length5.4 miles
CityPalm Harbor Tarpon Springs
CountyPinellas
RoadAlt US 19 Palm Harbor Boulevard Pinellas Avenue
Construction Cost$19.8 million
Estimated CompletionSummer 2026
ContractorWatson Civil Construction, Inc.
Contact Information
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of July 1, 2026, all construction activities associated with this project have been completed.
This project is repaving ALT US 19 (Palm Harbor Boulevard/Pinellas Avenue) from south of Tampa Road to north of Meres Boulevard in Pinellas County.
In addition to roadway resurfacing, the project includes the installation of raised median islands, sidewalk and drainage upgrades, as well as signal improvements featuring the installation of a full traffic signal at Virginia Avenue.
Safety enhancements are also being added to include mid-block pedestrian crossings featuring Rectangular Rapid Flashing Beacons (RRFBs) at Columbia Avenue, Hidden Lake Drive, and Ketch Circle. Mid-block crossings with Pedestrian Hybrid Beacons (PHBs) will be installed to the north of Alderman Road, Brevard Street, Wai Lani Road, and Valley Road.
Construction activities are taking place during both daytime and nighttime hours. Any work requiring detours will occur from 7 p.m. to 7 a.m. Access to driveways, sidewalks, and side streets are being maintained throughout the duration of the project.
Motorists are reminded to use caution when driving through the work zone and to remain alert for pedestrians and construction workers.
The $19.8 million repaving project is expected to finish during summer 2026.