← 1239.pdf_v_d08032026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
SR 688 (Ulmerton Road) & SR 686 (Roosevelt Boulevard) Sidewalk Improvements 450969-2-52-01
| Project Details | |
| Work Type | Sidewalk Improvements |
|---|---|
| Phase | Design |
| Limits | SR 688 (Ulmerton Road) from Roosevelt Boulevard off-ramp to Carillon Parkway; SR 686 (Roosevelt Boulevard) from 28th Street N to 16th Street N; SR 686 (Roosevelt Boulevard) from Lake Carillon Drive to Ulmerton Road |
| Length | 1.99 miles |
| City | Clearwater St. Petersburg |
| County | Pinellas |
| Road | Roosevelt Boulevard SR 686 SR 688 Ulmerton Road |
About
The purpose of this project is to construct 6-foot concrete sidewalks at the following locations in Pinellas County:
- Along the south side of SR 688 (Ulmerton Road) from Roosevelt Boulevard off-ramp to Carillon Parkway
- Along the west side of SR 686 (Roosevelt Boulevard) from 28th Street N to 16th Street N
- Along the east side of SR 686 (Roosevelt Boulevard) from Lake Carillon Drive to Ulmerton Road
Construction is anticipated to begin late 2027.
Contact Information
Design Manager
Stephanie Wolchok 813-975-6244
Stephanie.Wolchok@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us