← 1025.pdf_v_d09252026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

SR 687 (4th Street North) Shared Use Path from SR 694 (Gandy Boulevard) to I-275 444244-1
Project Details
Work TypeBike Path/Trail Installation
PhaseConstruction
Limitsfrom SR 694 (Gandy Boulevard) to I-275
Project StartJanuary 12, 2026
Length2.082 Miles
CitySt. Petersburg
CountyPinellas
Road4th Street
Estimated CompletionEarly 2027
ContractorGosalia Concrete Constructors, Inc.
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will construct a shared-use path along the west side of SR 687 (4th Street North) from SR 694 (Gandy Boulevard) to I-275 in St. Petersburg.
The proposed shared-use path is designed to accommodate a range of non-motorized users, including pedestrians and bicyclists. By providing a facility that is physically separated from vehicular traffic, the project enhances safety for users while promoting alternative modes of transportation. The improvement supports a shift from automobile travel to walking and bicycling, helping to reduce roadway congestion and encourage more walkable, connected communities.
Construction is anticipated to be complete early 2027.
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 444244-1) Last Updated: 09/25/2026