← 1110.pdf_v_d10092026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SR 674 Resurfacing from east of CR 579 to Katie Stanaland Drive 451995-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
Limitsfrom CR 579 to Katie Stanaland Dr
Length2 miles
CityLithia
CountyHillsborough
RoadSR 674

Contact Information

Design Manager

Lauren Blakeley

813-975-3669

Lauren.Blakeley@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road 674 in Hillsborough County.

In addition to resurfacing, the project also includes minor guardrail replacements on the bridges along this section.

Construction activities are anticipated to begin in Spring 2028.