← 392.pdf_v_d04092026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
Interstate Lighting Upgrades along I-75 and I-4 in Hillsborough County 437789-1-52-01
Project Details
Work TypeInterstate Lighting upgrades
PhaseDesign
Limitsalong I-75 and I-4 in Hillsborough County
CityBrandon Gibsonton Plant City Riverview Tampa
CountyHillsborough
RoadI-4 I-75
Contact Information
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will upgrade the highway lighting to LED at the following locations;
I-75 at Gibsonton Drive
I-75 at US 301
1-75 between SR 676 (Causeway Blvd) and SR 618 (Selmon Expressway)
I-4 at Park Road
The project is currently in design.
Construction activities are anticipated to begin in 2029.