← 913.pdf_v_d05112026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
SR 590 (Drew Street) Repaving from Osceola Avenue to US 19 445681-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Design |
| Limits | from Osceola Avenue to US 19 |
| Length | 4.7 miles |
| City | Clearwater |
| County | Pinellas |
| Road | Drew Street SR 590 |
Contact Information
Design Manager
- Kevin Lee
- 975-6426
- Kevin.Lee@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As part of the improvement project on SR 590/ Drew Street from Osceola Avenue to US19, FDOT is proposing the following:
- Road resurfacing, upgrading ADA features, and improving lighting.
- Realigning Cleveland Street and Missouri Avenue by installing a new raised median to separate turning movements and to reduce crashes.
- New raised median along Drew Street from N. Missouri Avenue to the signalized intersection to reduce conflicts and improve safety.
- Lane reduction from four lanes to two lanes from Osceola Avenue to Myrtle Avenue with a separated bike lane.
- Widening between Missouri Avenue and Betty Lane to improve safety and access.
- Closing the median opening at Cirus Avenue and extend the left-turn lane at Hercules Avenue to minimize turning conflicts and improve traffic flow and roadway safety.
- New signalized intersection with pedestrian crossings at Drew Street and N. Lake Drive.
- New controlled midblock crossing for pedestrians just east of Anna Avenue.