← 456.pdf_v_d08012023.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 301 Repaving from Lake St Charles Blvd to Progress Blvd/Bloomingdale Ave & NB I-75
On-ramp Improvements 441388-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | from Lake St Charles Blvd to Progress Blvd/Bloomingdale Avenue and the northbound I-75 On-ramp from US 301 |
| Project Start | August 4, 2021 |
| Length | 1.5 miles |
| City | Riverview |
| County | Hillsborough |
| Road | US 301 |
| Construction Cost | $21.4 million |
| Estimated Completion | Summer 2023 |
| Contractor | Ajax Paving Industries of Florida, LLC |
About
All construction activities associated with this project were completed on Friday, July 28, 2023.
Contact Information
Project Information
Maricelle Venegas 813-975-6204 roadwork@dot.state.fl.us
This design-build project repaved US 301 between Lake St. Charles Boulevard and Progress Boulevard/Bloomingdale Avenue in Riverview.
Additional improvements:
replaced the asphalt pavement with a durable concrete surface at the intersection of US 301 and Progress Boulevard/Bloomindale Avenue.
added a through lane to westbound Bloomingdale Avenue.
added sidewalk along the east side of US 301.
widened the northbound I-75 on-ramp from US 301.
This project was combined with 427454-3 into a single construction contract.
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us