← 756.pdf_v_d06172024.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
I-275 Repaving from Bearss Avenue to bridge over Nebraska Avenue 445494-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | I-275: Bearss Ave to bridge over Nebraska Ave & Bearss Ave from Florida Ave to Nebraska Ave |
| Project Start | September 18, 2023 |
| Length | .8 miles |
| County | Hillsborough |
| Road | I-275 |
| Construction Cost | $4.5 million |
| Estimated Completion | Spring 2024 |
| Contractor | Hubbard Construction Co. |
Contact Information
Project Information
Maricelle Venegas 813-975-6204
RoadWork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
All construction activities associated with this project were completed on June 12, 2024.
This project repaved I-275 from the Bearss Avenue interchange to the bridge over Nebraska Avenue in Tampa.
In addition, SR 678 (Bearss Avenue) between Florida Avenue and Nebraska Avenue was repaved.
Construction activities took place during daytime and nighttime hours. Work requiring lane closures along I-275 occurred at night between 8 p.m. and 5 a.m. Occasionally, interstate ramps closed during nighttime hours between 11 p.m. and 5 a.m.
Access to driveways, sidewalks, and side streets were maintained.
Drivers were reminded to use caution when traveling through the work zone and to remain alert for pedestrians and construction workers.
### #