← 865.pdf_v_d12032024.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 41 (Nebraska Ave) Pedestrian Upgrades from Kennedy Blvd to Arctic St 443492-1-52-01
| Project Details | |
| Work Type | Urban Corridor Improvements |
|---|---|
| Phase | Completed |
| Limits | from Kennedy Blvd to Arctic St |
| Project Start | January 3, 2024 |
| Length | 5.4 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Nebraska Avenue (Hillsborough) US 41 |
| Construction Cost | $2.6 million |
| Estimated Completion | Fall 2024 |
| Contractor | Burgess Civil, LLC |
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
All construction activities associated with this project were completed on Monday, December 2, 2024.
This project added various pedestrian features along Nebraska Avenue (US 41) between Kennedy Boulevard and Arctic Street in Tampa.
Improvements included the installation of mid-block crossings, rectangular rapid flashing beacons, pedestrian signals, pedestrian refuge islands, pedestrian lighting and pedestrian hybrid beacon signals.