← 1237.pdf_v_d07242026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 582 (Fowler Avenue) Resurfacing from east of Florida Avenue to west of Nebraska Avenue 455591-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 582 (Fowler Avenue) from east of Florida Avenue to west of Nebraska Ave |
| Length | 0.46 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Fowler Avenue SR 582 |
Contact Information
Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of SR 582 (Fowler Avenue) in Hillsborough County.
Other improvements include ADA upgrades, sidewalk repair, and safety improvements.
Construction is currently anticipated to begin Spring 2029.