CR 52 Repaving from Storch Lane to US 98/US 301 and CR 52 Roundabout at College Ave./Pompanic St. 439832-1-52-01 and 439832-3-52-01

Project Details
Work TypeRoundabout
PhaseCompleted
Length8 miles
CityDade CitySan AntonioSt. Leo
CountyPasco
RoadCR 52
ConstructionCost$10.2 million
EstimatedCompletionSummer 2025
ContractorWatson Civil Construction, Inc.

Contact Information

Project Information

John McShaffrey

813-975-6930

john.mcshaffrey@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

As of June 23, 2025, all construction activities associated with this project have been completed.

Two projects were combined to be built under one design-build construction project:

  1. Resurfacing of CR 52 from west of Storch Lane to US 98/US 301 (439832-1-52-01); and
  2. CR 52 at College Avenue / Pompanic Street Roundabout (439832-3-52-01).

The project repaved CR 52 (formerly SR 52) from west of Storch Lane in San Antonio to east of Smith Road in Dade City, and from south of Center Avenue to US 98/US 301 in Dade City. Resurfacing from east of Smith Road to south of Center Avenue was done under a previous project (429076-4).

A roundabout was constructed at the intersection of CR 52 and College Avenue / Pompanic Street in the City of San Antonio. City of San Antonio utilities were also relocated for the roundabout.

Here is a cost breakout for construction of each of the three major portions of the construction project:

  • CR 52 milling and resurfacing (project 439832-1-52-01); $7.2 million.
  • CR 52 & College/Pompanic Roundabout (project 439832-3-52-01): $2.7 million
  • City of San Antonio Utility relocations for roundabout (project 439832-3-56-01): $280,500