← 1007.pdf_v_d03042026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Inverness Transportation Talks 452950-1
Project Details
| Project Details | |
| Work Type | Streetscape and Safety Improvements |
|---|---|
| Phase | Completed |
| City | Inverness |
| County | Citrus |
| Road | Carl G Rose Highway SR 44 |
About
Contact Information
This study is complete as of March 2026.
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
The Florida Department of Transportation (FDOT) wants to hear from you!
FDOT invites you to attend and participate in future Inverness Transportation Talks Community Meetings for the below listed corridors.
Corridor Study Areas:
SR 44 from Tighe Drive to Hendrix Avenue
SR 44 from Hendrix Avenue to South Elmwood Drive
SR 44 from South Elmwood Drive to South Fauna Point
SR 200 from East Summit Lane to East Spruce Drive
Inverness Transportation Talks is a community outreach process that is not associated with any particular project. This process will consist of multiple community meetings paired with feasibility studies by the FDOT to provide opportunities for the Inverness community to share experiences and provide feedback on specific areas.