CR 582A (Morris Bridge Road) New Traffic Signal at SB I-75 Entrance Ramp 254677-5-40

Project Details
Work TypeSafety Improvements
PhaseCompleted
LimitsFletcher Avenue and I-75 SB Exit Ramp
Project StartSummer 2024
CityTampa Temple Terrace
CountyHillsborough
RoadFletcher Avenue
Construction Cost$900,000
Estimated CompletionSpring 2025
ContractorCone & Graham, Inc.

Construction is underway and expected to be complete in spring 2025.

***** *****

Contact Information

Project Information

Maddie Griffin 727-575-8334

roadwork@dot.state.fl.us

About

As of April 9, 2025, all construction activities associated with this project have been completed.

The Florida Department of Transportation's Design-Build firm, Cone & Graham, Inc., is installing a new traffic signal at Morris Bridge Road (CR 582A) onto the southbound I-75 entrance ramp in Hillsborough County.

Other safety and operational improvements include roadway resurfacing, installing sidewalk, and extending the westbound left-turn lane from Fletcher Avenue onto the I-75 southbound entrance ramp.

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.