← 1164.pdf_v_d10162026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
I-4 Widening from I-75 to west of Polk Parkway 456967-1-52-01
Project Details
Work TypeWidening
PhaseDesign
LimitsI-4 from I-75 to west of Polk Parkway
Length18 miles
CityDover Mango Plant City Seffner Tampa
CountyHillsborough
RoadI-4
Contact Information
Design Manager
Omar Chehab
813-975-6468
Omar.Chehab@dot.state.fl.us
Media Contact
Mary Cox
407-716-2832
Mary.Cox@dot.state.fl.us
About
This project will widen Interstate 4 (I-4) along the median to add one buffer-separated express lane in each direction. The I-4 bridges over McIntosh Road, Branch Forbes Road, Thonotosassa Road, Alexander Street, Paul Buckman Hwy/Wheeler Street, Park Road and Charlie Taylor Road will also be widened.
In addition to widening, the project also includes retaining walls, noise barriers and tolling equipment.
Other improvements include signing and pavement markings and Intelligent Transportation Systems (ITS).
Construction is currently anticipated to begin in 2028.