Tampa Bay Florida Department of Transportation
I-75 / SR 56 Diverging Diamond Interchange (DDI) 430573-1-52-01
Project Details
Work TypeInterchange Improvement
PhaseCompleted
Limitsfrom east of CR 54 to west of Cypress Ridge Boulevard
Project StartJanuary 2019
CityLutz Wesley Chapel
CountyPasco
RoadI-75 SR 56
Construction Cost$34.8 million
Estimated CompletionEarly 2023
ContractorSuperior Construction Company Southeast, LLC
Contact Information
Project Information
John McShaffrey 813-975-6930
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of April 4, 2023, all work was completed and this project was final-accepted from the contractor.
This project reconfigured the I-75 / SR 56 interchange between CR 54 and Cypress Ridge Boulevard in Pasco County. The former diamond interchange was modified and converted to a diverging diamond interchange (DDI). The main change was to diverge (cross) SR 56 traffic to the left side of the road through the interchange, and then cross vehicles back over to the right side of the road on the opposite side of the interchange. The improvements help alleviate traffic congestion at the interchange to reduce travel time for motorists in this rapidly growing area.
Construction cost includes original construction contract amount plus approved contract changes. It does not include inspection oversite.