← 988.pdf_v_d03052026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 582 (Fowler Ave) Repaving from 51st Street to Riverhills Dr 446270-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
LimitsBruce B Downs Blvd to Riverhills Dr
Project StartJanuary 6, 2025
Length3.5 miles
CityTampa Temple Terrace
CountyHillsborough
RoadFowler Avenue
Construction Cost$8.1 million
Estimated CompletionEarly 2026
ContractorPreferred Materials, Inc.
About
All construction activities associated with this project were completed on Friday, February 6, 2026.
This project repaved Fowler Avenue (SR 582) from west of 51st Street to west of Riverhills Drive in Temple Terrace.
Other improvements included the addition of a new mid-block pedestrian signal at 52nd Street, extension of the westbound left-turn lanes onto 56th Street, retrofitted highway lighting, updated ADA features, and performed minor drainage work.
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us