US 301 New Traffic Signal at Ambleside Boulevard in Hillsborough County 254677-5-46

Project Details
Work TypeSafety Improvements
PhaseCompleted
Limitsat Ambleside Boulevard
Project StartSummer 2024
CityRiverview
CountyHillsborough
RoadUS 301
Construction Cost$420,000
Estimated CompletionSummer 2025
ContractorCone & Graham, Inc.

Contact Information

Project Information

Bryce Johns

727-575-8334

roadwork@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

As of July 24, 2025, all construction activities associated with this project have been completed.

This project addressed safety improvements with the construction of a new traffic signal on US 301 at Ambleside Boulevard in Hillsborough County

Elements of work included:

- installing new traffic signal

  • installing new traffic signal
  • resurfacing a section of roadway
  • adding sidewalk and pedestrian features Construction activities were completed in summer 2025. ********************************************************************* ************ What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.

Construction activities were completed in summer 2025.

***** *****

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.