US 301 New Traffic Signal at Ambleside Boulevard in Hillsborough County 254677-5-46
| Project Details | |
| Work Type | Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | at Ambleside Boulevard |
| Project Start | Summer 2024 |
| City | Riverview |
| County | Hillsborough |
| Road | US 301 |
| Construction Cost | $420,000 |
| Estimated Completion | Summer 2025 |
| Contractor | Cone & Graham, Inc. |
Contact Information
Project Information
Bryce Johns
727-575-8334
roadwork@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
As of July 24, 2025, all construction activities associated with this project have been completed.
This project addressed safety improvements with the construction of a new traffic signal on US 301 at Ambleside Boulevard in Hillsborough County
Elements of work included:
- installing new traffic signal
- installing new traffic signal
- resurfacing a section of roadway
- adding sidewalk and pedestrian features Construction activities were completed in summer 2025. ********************************************************************* ************ What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.
Construction activities were completed in summer 2025.
***** *****
What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project. The contract work covers from initial design through construction completion. This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously.